Portable Gas Turbine Package
IHI Power Systems Co.,Ltd.
Technology / Service Summary
Taking advantage of the features of the LM6000 gas turbine, which boasts high reliability and the highest power generation efficiency in its class, we have succeeded in our original design improvement and significant reduction of on-site construction. Fast Power 40 Gas Turbine Package realizes a 40 MW class power generation business with low environmental impact, low costs, and short delivery times.
Purpose
-
Feature
・FAST; short delivery time, pre-commissioned, minimal onsite installation time (2-weeks), fast-starting capability (cold iron to full load in only 5min.)
・FLEXIBLE; dual fuel (gas & liquid), excellent load following capability, transportable by road, air, or sea, easy to relocate (transport by module)
・SUSTAINABLE; highly fuel efficient, complied with the World Bank emission guidelines without water injection, no cooling water, 40MW class outstanding power density with a compact footprint
Effect
1.Since operation is performed without using water, it is possible to continue a stable power generation business even in areas where it is difficult to secure water resources.
2.Easing restrictions on site area and transportation by reducing weight and installation area.
3.Due to the short delivery time and portability, we can flexibly respond to temporary power supply needs and relocation plans that match the customer's business.
4.Contributes to saving CAPEX by reducing on-site construction, and saving OPEX by adopting high efficiency GT, air cooling type, DLE combustor and the short shut down period by engine exchange.
5.Contributes to the power system stability due to fast-start (5 min) capability and excellent load following capability.
6.Liquid and gas fuels can be used according to the environment.
7.Contributes to CO2 reduction in both Japan and partner countries by utilizing JCM.
Controlled Substance
Applicable Regions / Countries
- Japan
- Southeast Asia
- Central/South Asia
- China/ East Asia
- Middle East
- Africa
- Oceania
- Europe
- Central/South America
- ASEAN countries
Indonesia,Cambodia,Singapore,Thailand,Philippines,Brunei Darussalam,Viet Nam,Malaysia,Myanmar,Lao PDR
Accomplishments
<LM6000PF Delivery Record (As of April 2020) >
Japan: 3 units
Overseas: 10 units
It has been introduced in Southeast Asia, Australia, and Africa, and has maintenance bases in Thailand, Australia, North America, and Japan.
Related SDGs Goals
- 6. Clean Water and Sanitation
- 7. Affordable and Clean Energy
- 8. Decent Work and Economic Growth
- 9. Industry, Innovation and Infrastructure
- 13. Climate Action
- 17. Partnerships to achieve the Goal